For architecture practices

Site visits, client meetings and the time that pays for them.

A practice bills in stages but runs on hours. The gap between the two is where the margin quietly goes.

Take a look inside
  • Site and studio diary
  • Hours against stages
  • Retainer balances
  • Invoice from the record
Today

What usually breaks first.

Time recorded a week late

Reconstructed on Friday from a calendar and a memory, and attached to whichever stage seems closest.

Visits that cost more than the fee

Travel out, waiting, the meeting, the write-up. Only the meeting is ever counted.

Stage fees and the work around them

Agreed at the start, eroded by work nobody logged, discovered when the stage is already closed.

How it fits

Built around how architecture practices actually work.

Visits and meetings on one week

With the room, the person and the travel either side — not three calendars that disagree by Wednesday.

Hours against the right stage

Time logged as it happens and attached to the stage it belongs to, while anyone can still remember.

Stages and retainers as real balances

What was agreed, what has been drawn down and what remains — a number, not an estimate.

Invoices that match the record

Raised from logged hours and completed visits, so the fee note and the timesheet say the same thing.

Your words

The screens say what you say.

These are the words your team already uses, and they are the words on every screen, every email and every report.

  • Client
  • Appointment
  • Architect
  • Studio or site
  • Fee stage or retainer
A day

One day, start to lock-up.

  1. 08:30The day separates studio work from site work, with the travel already held.
  2. 10:00A site meeting with the structural engineer, booked into the same diary.
  3. 14:00Two hours logged against stage three while the work is still fresh.
  4. 18:00The stage balance is current, so the fee note writes itself from the record.
The difference

Three things generic booking tools get wrong here.

Stages

A stage is not a month

Fee stages run to their own length, and the balance follows the stage rather than the calendar.

Consultants

The people who are not your staff

Structural, services and surveyors sit in the same meetings without sitting on your payroll.

Drawings

Drawings and models stay in your tools

This covers the diary, the hours and the fee. It does not manage the drawing set, revisions or transmittals.

Inside

A look inside.

Today's schedule

Thursday · 6 classes · 2 instructors

4 checked in
Booked today
38of 44 seats
Fill rate
86%+4 pts on last week
On waitlist
62 slots ready to open
Unpaid
31 overdue 12 days

Today's schedule

Tap a class to open its roster

Day
6:00AMStrength BlockSam B · Rig A · 60 minLMTORK+58 / 8full
9:30AMVinyasa Level 2Mira V · Studio 1 · 75 minACJP+911 / 143 free
11:00AMPrivate — Marco D.Mira V · Studio 2 · 50 min1:11 / 1booked
4:30PMBeginner ReformerDev K · Studio 2 · 55 minENFB+46 / 62 waiting

Sample data. Your demo is built on your own timetable.

Also built for

Other design businesses.

Bring us one week of your schedule.

Thirty minutes. We build your real timetable, your rooms and one roster live, and you decide if it is better than what you do now.